Sweetwater
Execution support on a Texas onshore wind development, contributing to 585 MW of installed capacity across one of the state’s large-scale wind build-outs.
The Challenge
A large-scale Texas onshore wind development required execution support sustained across a 585 MW build programme, where delivery pace and technical coordination have to hold together over a long construction horizon.
Our Approach
Aldott carried execution support through the programme, maintaining technical coordination across the phases that took the project to its installed capacity.
- Execution support across the 585 MW build programme
- Technical coordination through construction phases
- Delivery oversight at large-scale onshore array scale
The Outcome
Contributed to 585 MW of installed onshore capacity in Texas.
Related Projects

HT1 Aberdeen Bay
Led site-specific load analysis and structural integration for a combined offshore wind and hydrogen production platform, aligning turbine loads, foundation design, and hydrogen infrastructure into a single certifiable structural system.
View project
Normandy I & II
Delivered layout design and site-specific load studies across two large offshore arrays, optimising turbine spacing and foundation loading against metocean data and wake-interaction effects at scale.
View project
Brittany Floating Wind
Engineered floating substructure and mooring load concepts through dynamic design analysis across combined wind, wave, and platform-motion load cases.
View projectDiscuss a project with our engineers
Talk to our engineering team about your next wind energy project. We aim to respond within one business day.
European headquarters, client engagement, project management, certification coordination
Engineering office, loads analysis, design support, documentation