
Alta Wind Energy Center
Full planning and delivery support on one of California’s largest wind farms, running GE turbines across the development.
The Challenge
One of California’s largest wind farms required planning and delivery support end to end — a GE turbine fleet taken from planning through to delivery without the handoffs between phases that normally fragment a project of that size.
Our Approach
Aldott supported the project across planning and delivery, holding technical continuity from the planning stage through execution on a GE turbine fleet.
- Planning support across the development
- Delivery support through project execution
- Technical coordination for a GE turbine fleet
- Continuity held across planning and delivery phases
The Outcome
Planning and delivery support provided across one of California’s largest wind farms.
Related Projects

HT1 Aberdeen Bay
Led site-specific load analysis and structural integration for a combined offshore wind and hydrogen production platform, aligning turbine loads, foundation design, and hydrogen infrastructure into a single certifiable structural system.
View project
Normandy I & II
Delivered layout design and site-specific load studies across two large offshore arrays, optimising turbine spacing and foundation loading against metocean data and wake-interaction effects at scale.
View project
Brittany Floating Wind
Engineered floating substructure and mooring load concepts through dynamic design analysis across combined wind, wave, and platform-motion load cases.
View projectDiscuss a project with our engineers
Talk to our engineering team about your next wind energy project. We aim to respond within one business day.
European headquarters, client engagement, project management, certification coordination
Engineering office, loads analysis, design support, documentation